Author:Haina Machinery Factory FROM:Diaper Machinery Manufacturer TIME:2023-03-30
Generally, if there are accident losses, you often only know how to calculate casualties and equipment damage, but this is too simple. Let's take a look at the calculation method of pull-up baby diaper machine accident losses.
Downtime: from the time the equipment is damaged and shut down, until it is put into use after repair. Repair time: from the start of repairs to the time when all repairs are completed and delivered for production use.
Repair cost refers to the cost of equipment accident repair, and its calculation method is: repair cost = repair material cost + spare parts cost + tool auxiliary material cost + man-hour cost
The cost of shutdown loss refers to the production loss caused by equipment downtime due to accident. The calculation method is: cost of shutdown loss = downtime x production cost per unit time (yuan/h)
Accident loss cost refers to the cost loss caused by the accident forcing the equipment to stop production and repair. The calculation method is: accident loss cost = production stop loss cost + repair cost
As long as you master the above 4 formulas, you can roughly calculate the various losses in the pull-up baby diaper machine accident, and get more accurate, rather than a single diaper machine